Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice ODD FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.:
Auditor
Stanley Chen
NPSU-PPE
1. Loosen ODD/B screw
(6052B0049401)*1(Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
2. Disassembly ODD/B , and put it in the box.
3. Put bottom case in the box (6070B1043301)
Disassembly top cover
5(1/1)
0.10
2016/6/29
Cross electrical screw driver #1 1
图一
Fig.1
screw
Fig. 2