Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice Audio FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.
Auditor:
Stanley Chen
NPSU-PPE
1. Disassembly Mic.-1 cable connector
from audio/B , and disassembly it from
the frame . (Fig.1)
2. Disassembly Mic.-2 cable connector
from audio/B , and disassembly it from
the frame . (Fig.2/Fig.3)
Disassembly Mic. -1 & Mic. -2 cable
4(1/1)
0.10
2016/6/29
图一
图二
图三