Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.:Auditor:
Stanley Chen
NPSU-PPE
1. Loosen screw *4 of bottom case (Fig.1)
Torque:3.0 ± 0.2 Kgf.cm
2. Take off bottom case (6070B1043901) ,and
put it in the box
Disassembly bottom case
1(1/1)
0.10
2016/6/29
Fig. 1
3
1
2
4
Cross electrical screw driver #1 1
Fig. 2