Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.:Auditor:
Stanley Chen
NPSU-PPE
1. Disassembly Speaker connector form MB
2. Disassembly Speaker
module(6039B0082201) and put it in the
box
Do not press the Speaker eardrum when
disassembly the speaker .
Disassembly Speaker
2(1/1)
0.10
2016/6/29
Speaker
Connector
eardrum
Put the right side hook , and
release the speaker .