Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.:Auditor:
Stanley Chen
NPSU-PPE
1. Disassembly HDD connector from MB(Fig.
2)
2. Loosen HDD bracket screw *4 (Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
Disassembly HDD
3(1/1)
0.10
2016/6/29
Cross electrical screw driver #1 1
HDD
connector
1
2
3
4
Fig.1
Fig.2
Fig.3