Standard Operation Procedure
Document No. Nantucket FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Uen-tung
NPSU-PPE
Auditor :
Uen-tung
4(2/3)
1.0
2017/6/13
1. Loosen front frame screw *3
1
2
3
Loosen screw
Electric cross screwdriver #0 1
Support fixture 1
Fig.1
Fig .2
Fig .3