Standard Operation Procedure
Document No. Nantucket FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Uen-tung
NPSU-PPE
Auditor :
Uen-tung
8(1/1)
1. Loosen screw *2
2. Disassemble CFD Cable
3. Disassemble CFD module
Disassemble CFD
1.0
2017/6/13
Electric cross screwdriver #1 1
Fig.1
Fig.2