Standard Operation Procedure
Document No. Nantucket FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Uen-tung
NPSU-PPE
Auditor :
Uen-tung
7(1/1)
1. loosen MSR LED/B screw*1
2. Disassemble MSR Cable
3. Disassemble MSR LED/B
Disassemble MSR LED/B
1.0
2017/6/13
Fig.1
Fig.2
Electric cross screwdriver #1 1