Standard Operation Procedure
Document No. Nantucket bezel Air bonding DIS SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Uen-Tung
NPSU-PPE
Auditor :
Uen-Tung
3(1/1)
1. Disassemble EMI SPONGE
2017/6/5
1.0
Disassemble EMI SPONGE