EasyManuals Logo
Home>HP>Switch>OfficeConnect 1405 Series

HP OfficeConnect 1405 Series User Manual

HP OfficeConnect 1405 Series
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
2-4
Installing the Switch
Installation Procedures
Installation Procedures
These steps summarize your switch installation. The rest of this chapter
provides details on these steps.
1. Prepare the installation site (page 2-5). Make sure the physical
environment into which you will be installing the switch is properly
prepared, including having the correct network cabling ready to connect
to the switch and having an appropriate location for the switch. See page
2-3 for some installation precautions.
2. Verify the switch passes self test (page 2-6). Plug the switch into a
power source and observe that the LEDs on the switch’s front panel
indicate correct switch operation.
3. Mount the switch (page 2-8). The switches can be mounted on a wall
or on a horizontal surface.
4. Connect power to the switch (page 2-11). Once the switch is mounted,
plug it into the main power source.
5. Connect the network devices (page 2-12). Using the appropriate
network cables, connect the network devices to the switch ports.
At this point, your switch is fully installed. See the rest of this chapter if you
need more detailed information on any of these installation steps.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP OfficeConnect 1405 Series and is the answer not in the manual?

HP OfficeConnect 1405 Series Specifications

General IconGeneral
BrandHP
ModelOfficeConnect 1405 Series
CategorySwitch
LanguageEnglish

Related product manuals