EasyManua.ls Logo

HP PROCURVE 2520

HP PROCURVE 2520
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A-6
Planning Considerations
Specific Considerations for the 5400zl/8200zl Switches
Planning Considerations
Specific Considerations for the 5400zl/
8200zl Switches
The following is an example list of considerations during the planning phase
specific to the 5400zl/8200zl Switches:
â–  What if power is lost to the switch?
• Power for the switch to operate (system power)
• Power for PoE devices
â–  Which devices to plug into which ports, modules, and with what priorities?
• Slot prioritization
• Port prioritization
• Port priority class
• Reserve watts
• Total watts available
â–  Which modules will be used for PoE and which will not?
â–  Will load balancing be used?

Table of Contents

Other manuals for HP PROCURVE 2520

Related product manuals