EasyManuals Logo

HP ProCurve 5412ZL User Manual

HP ProCurve 5412ZL
460 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #200 background imageLoading...
Page #200 background image
4-8
Switch Meshing
Configuring Switch Meshing
Configuring Switch Meshing
Preparation
Before configuring switch meshing:
Review the Operating Rules (page 4-4), and particularly the restrictions
and requirements for using switch meshing in environments that include
static trunks, multiple static VLANs, GVRP, IGMP, and MSTP.
To avoid unnecessary system disruption, plan the mesh bring-up to mini-
mize temporary port-blocking. (Refer to “Bringing Up a Switch Mesh
Domain” on page 4-7.)
To view the current switch mesh status on the switch, use the CLI show
mesh command (page 4-12).
Menu: To Configure Switch Meshing
1. From the Main Menu, select:
2. Switch Configuration
2. Port/Trunk Settings
2. Press [E] (for Edit) to access the load balancing parameters.
Figure 4-6. Example of the Screen for Configuring Ports for Meshing

Table of Contents

Other manuals for HP ProCurve 5412ZL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP ProCurve 5412ZL and is the answer not in the manual?

HP ProCurve 5412ZL Specifications

General IconGeneral
Input Voltage100-240 VAC
Jumbo Frame SupportYes
LayerLayer 3
Port Type10/100/1000Base-T, SFP
ManagementCLI, Web, SNMP

Related product manuals