EasyManua.ls Logo

HP ProLiant ML350e - Page 83

HP ProLiant ML350e
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware options installation 83
7.
Install the LFF hot-plug drive cage.
8. Using the T-15 screws, secure the drive cage to the server.
9. If installed, remove the PCI air baffle (on page 28).
10. Remove any installed full-length PCI cards.
11. Remove the system air baffle (on page 30).
12. Remove the fan cage (on page 31).

Other manuals for HP ProLiant ML350e

Related product manuals