Standard Operation Procedure
Tabulator: Issue Department:
Xin-Xin Chen NPSU-PPE
Auditor :
Ethan Lai
Steps:
Document No. : Pegasus600 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out Top Vent
8(1/1)
2017/5/23
1.00
1. Unscrew (× 5) all joints of Top Vent illustrated
as Fig. 1.
Torsion: 4.0 ± 0.5 kgf.cm
Take the screwdriver vertically to the screw
holes.
Put the screws into the material box.
2. Follow the unscrewing sequence to take out
Top Vent.
Don't pull it using force.
Glove Requirements: Half-finger gloves
Fig. 1
Electric Screwdriver (S-4000MS) 1
Bits Type: T15,φ=5mm,L=60mm 1
1
5
4
3
2