Standard Operation Procedure
Tabulator: Issue Department:
Xin-Xin Chen NPSU-PPE
Auditor :
Ethan Lai
Steps:
Document No. : Pegasus600 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Take out Center IO Door & unscrewing
9(1/1)
2017/5/23
1.00
1. Unscrew (× 5) all joints illustrated as Fig. 1 &
Fig. 3.
Torsion: 4.0 ± 0.5 kgf.cm
Take the screwdriver vertically to the screw
holes.
Put the screws into the material box.
2. Take out Center IO Door (Fig. 2).
3. Take out Center Cover (Fig. 1).
Glove Requirements: Half-finger gloves
Fig. 3
Electric Screwdriver (S-4000MS) 1
Bits Type: T15,φ=5mm,L=60mm 1
2
3
5
4
Take out to
the right
IO Door
Pull out
vertically
Fig. 1
Fig. 2
1
K-LOCK
screw