EasyManua.ls Logo

HS Tarm 2000 - Installation; Planning and Requirements

HS Tarm 2000
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION PAGE 10
BEFORE YOU BEGIN
SAFETY NOTICE: READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND
OPERATE YOUR NEW BOILER. FAILURE TO FOLLOW THE
INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE OR
BODILY INJURY.
Contact local building or fire officials as the installation must be done in accordance with local
ordinances, which may differ in some ways from this manual. Your local building official is the
final authority for approving your installation as safe and determining that it meets local and
state codes.
The metal listing label permanently attached to the lift ring and or the top of the boiler under the
jacket and insulation of your Tarm EXCEL boiler (also shown on page 59 of this manual)
indicates that the boiler has been tested to current UL and CSA standards and gives the name
of the testing laboratory. Clearance information also is printed on this label. When the boiler is
installed according to the information both on the label and in this manual, local authorities in
most cases will accept the label as evidence that the installation meets codes and can be
approved.
IMPORTANT: Failure to follow these installation instructions and guidelines may result in a
dangerous situation. Follow the instructions and do not allow makeshift
compromises to endanger property or personal safety.
PLANNING THE INSTALLATION
NOTE: Your heating system design and installation should be done by a qualified local
professional contractor.
Only persons knowledgeable in the layout and installation of heating systems should attempt
the installation of any boiler. Proper planning and installation of your heating system and boiler
will help greatly to assure many years of safe, dependable, comfortable and economical
heating.
10

Table of Contents