EasyManua.ls Logo

HS Tarm 2000 - Boiler Packing List

HS Tarm 2000
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION (continued) PAGE 14
__________________________________________________________________________________________________________________________________________________________________________________
BOILER PACKING LIST
NOTE: PLEASE CHECK OFF THE FOLLOWING ITEMS ON THE LISTS BELOW:
A complete Excel 2000 series boiler, as shipped from our warehouse, consists of five (5)
pieces, as follows:
1. BOILER BODY
Ash Removal Pan
Ash Removal/Scraper Tool
Cleaning Brush
Installation Manual & Warranty Package
Box Containing Draft Fan
Flue Outlet
Turbulators – 6/EXCEL 2000, 8/EXCEL 2200 – should be installed in oil/gas heat exchange tubes
2. JACKET BOX
One (1) Front Panel
Four (4) Side Panels (2 left & 2 right)
One (1) Rear Panel
Two (2) Top Panels (front & rear)
Six (6) Pieces Steel Zip Strips
3. DOOR BOX
Loading Door
Ash Door (with viewing port)
By-Pass Lever Bakelite Knob (larger)
Secondary Air Bakelite Knob (smaller)
Plastic Bag Containing Eight (8) Door Mounting Bolts
Bakelite Handles for Doors (2)
One (1) Can of Door Mounting Cement and Applicator (Stovex)
4. SAFETY CONTROL PACKAGE
Boiler Pressure Relief Valve (#10-102-05, 30 psi)
Boiler Control Panel with Pre-Wired Honeywell Controls
Draft Fan Low Temp Cut-Off Control
Two (2) Pieces Immersion Well, 3/4 inch
Pressure/Temperature Gauge
Coil Pressure Relief Valve (#17-402-02, 100psi)(optional)
5. BURNER BOX
Oil Burner For EXCEL 2000 includes I GPH nozzle – For EXCEL 2200 includes 1.25 GPH nozzle
Or
and F-6 Retention Head.
Gas Burner Includes a duel acting Draft Regulator and a Manual Re-set spill switch.
Please contact your dealer immediately if any of the above items are missing!
TARM USA, INC. reserves the right to substitute equivalent equipment for any of the
controls and accessories specified above.
14

Table of Contents