EasyManua.ls Logo

HTP EFT-155 - Part 14 - Maintenance; Maintenance Procedures

Default Icon
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
78
LP-387 REV. 12.15.14
Table 30
PART 14 MAINTENANCE
A. MAINTENANCE PROCEDURES
Periodic maintenance should be performed once a year by a qualified service technician to assure that all the equipment is operating
safely and efficiently. The owner should make necessary arrangements with a qualified heating contractor for periodic maintenance of
the boiler. The installer must also inform the owner that a lack of proper care and maintenance of the boiler may result in a hazardous
condition.
BEFORE EACH HEATING SEASON a trained and qualified service technician should perform the inspections as per the boiler
inspection and maintenance schedule in the back of the manual. Failure to do so could result in death or serious injury.

Table of Contents

Other manuals for HTP EFT-155

Related product manuals