EasyManua.ls Logo

HTP EL-80 - Page 23

HTP EL-80
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LP-293 Rev. 9.24.15
23
NOTES:
1. This drawing is meant to show system piping concept only.
2. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
3. Piping shown is Primary/Secondary.
4. System ow (secondary loop) should be greater than the boiler primary loop ow. In all cases, the boiler primary loop ow rate must be
maintained above the minimum ow rates published in this manual.
5. Installations must comply with all local codes.
6. In Massachusetts, a vacuum relief valve must be installed in the cold water line per 248 CMR.
The piping will not support the weight of the circulators. Refer to the circulator manufacturer’s instructions to properly support
the circulator. Failure to comply with these instructions could result in property damage, severe personal injury, or death.
Figure 10 - Cascaded Space Heating
Primary
Loop
Primary Loop
Secondary Circuit

Table of Contents

Other manuals for HTP EL-80

Related product manuals