EasyManua.ls Logo

HTP UFT-80W - Vent Termination; Direct Vent, Two Pipe Roof and Sidewall Vent Terminations

HTP UFT-80W
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
LP-542 REV. 7.16.15
2. Direct Vent, Optional Horizontal and Vertical Vent Kits
Figure 10 Direct Vent, Vent Terminations (With Optional Kits)
All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.

Table of Contents

Other manuals for HTP UFT-80W

Related product manuals