EasyManua.ls Logo

Huawei FusionDC1000A - Structural System; Pre-fab. Module

Huawei FusionDC1000A
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 5: Install battery copper bars and power cables.
1. Open the terminal protective cover, install the copper bars between
battery modules, and close the terminal protective cover.
2. Open the terminal protective cover, install the copper bar between the
battery module and the fuse, and close the terminal protective cover.
3. Open the terminal protective cover, install the battery power cable
reserved in the cabinet, and close the terminal protective cover.
Step 6: Install the battery module cover.
Note: Place the cables at the notches and ensure that the covers do
not press the cables.
Step 7 Reinstall the battery control unit.
No.P007 Lithium Battery Cabinet Battery Module and Cable Installation Diagram 2

Other manuals for Huawei FusionDC1000A

Related product manuals