EasyManua.ls Logo

Huawei HES-319M - Page 33

Huawei HES-319M
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HES-319M Installation 33
To force a rescan by powering down the ODU:
1. Unplug either end of the AC power cord at the IDU. (a)
OR
Disconnect the PoE Cat5e cable from the OUT port at the IDU. (b)
OR
Disconnect the PoE Cat5e cable from the RJ-45 port at the ODU. (c)
2. Wait 10 seconds, then restore power.
The CPE performs a rescan. Wait about two minutes for the CPE to reconnect with a base station.

Related product manuals