EasyManua.ls Logo

Huawei IPE Series - Page 47

Huawei IPE Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IPE
Installation Guide
5 Installing a Vandal-Proof Dome IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
40
Figure 5-20 Disassembling the bracket and dome IPC
Bracket Lower cover
Upper cover Module Inner liner
Step 2 Assemble the module that is equipped with the multi-connector cable, as well as the ceiling-
mounted bracket.
Route the multi-connector cable on the module through the elbow of the ceiling-mounted
bracket. Push the module into the ceiling-mounted bracket and rotate the module clockwise
for about five degrees until the module cannot be rotated any further.
Step 3 Use the three black screws that are removed in Step 1 to fix the module onto the ceiling-
mounted bracket, as shown in Figure 5-21. (Spare screws are available in the accessory kit of
the ceiling-mounted bracket.)
Figure 5-21 Routing the cable
Multi connector cable-
Three black screws
Step 4 Stick the positioning label delivered with the IPC at the installation position of the dome.

Related product manuals