Figure 5-33 Removing external mechanical parts
Step 4 Remove the optical cable fastener.
Figure 5-34 Removing a fastener
Step 5 Connect one end of the optical jumper to the ber adapter.
Step 6 Route the other end of the optical jumper through the cable hole on the side of
the ATB, and connect the cable to the ATB.
Step 7 Connect the peripheral optical cable to the ATB, splice the optical cable and the
optical jumper, and wind the spliced cable around the ber spool on the ATB.
Step 8 Install an optical module on the CMU panel, connect one end of the optical
jumper to the optical module, and connect the other end to the ber adapter.
Only professionals are allowed to splice bers.
LUNA2000-2.0MWH Series Smart String ESS
User Manual 5 Installing Cables
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 135