EasyManua.ls Logo

Huawei LUNA2000-2.0MWH Series - Storage and Installation Environment Requirements

Huawei LUNA2000-2.0MWH Series
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
(Optional) Connecting Socket Cables
5.2
Cables 1733, 1735, 1734, and 1736 are pre-installed.
Cables 1751, 1752, 1757, 1760, 2055, 2056, 1761,
and 1762 need to be installed.
The cables to be installed can be obtained from the
cable binding position shown in the figure.
No.
Meaning
1
Cable binding
position
Before installing
cables, remove the
cover from the control
unit cabin.
After cables are
installed, reinstall the
cover to the control
unit cabin and seal the
cable holes at the
bottom with sealing
mud.
No.
Cable Hole
1
DC power cable hole
2
AC input power cable or ground cable hole
3
Optical cable or FE communications cable hole
4
UPS or RS485 cable hole (reserved)
This procedure applies only to the models listed in the table below.
Model
Air Conditioner Position in the Battery Cabin
LUNA2000
-2.0MWH-1HX
1/3/5/7/9/11
LUNA2000
-2.0MWH-2HX
LUNA2000
-2.0MWH-HE2HX
1/4/7/10

Other manuals for Huawei LUNA2000-2.0MWH Series

Related product manuals