EasyManua.ls Logo

Huawei LUNA2000-2.0MWH Series - Loading;Unloading and Transportation Requirements

Huawei LUNA2000-2.0MWH Series
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Scenario 2: Installing a 220 V Socket
Connect the live wire (corresponding to
cable 1756) and neutral wire
(corresponding to cable 1759) from the
lower end of the switch to positions 1
and 3 of the XT1 terminal block.
3. Connect the live wires (corresponding to cables 1757 and 1763) and neutral wires
(corresponding to cables 1760 and 1765) from the lower end of the terminal block to the
socket.
Steps 3 and 4 apply to the scenarios where a 220 V or 110 V socket is installed. The following
figures use a 220 V socket as an example.
2. Connect the live wire (corresponding
to cable 1751) and neutral wire
(corresponding to cable 1752) from
the lower end of the switch to
positions 1 and 3 of the XT1 terminal
block.

Other manuals for Huawei LUNA2000-2.0MWH Series

Related product manuals