EasyManua.ls Logo

Huawei NetEngine 8000 M14

Huawei NetEngine 8000 M14
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing a Device
5
5.3 Installing a Device in an ETSI 21-Inch Cabinet
with Middle Columns
1
Install floating nuts onto the cabinet.
2
Install the cable management frame
and power cable tray onto the device.
M3
2
1
M6
Installation hole
Floating nut
3
Remove the mounting ear on
the left side of the chassis,
move it to the middle of the
panel, and install an ETSI
conversion mounting ear.
Then, take out a 19-inch
mounting ear and an ETSI
conversion mounting ear
from the auxiliary material
package and install them on
the right side of the chassis
(that is, the side with a cable
management frame).

Related product manuals