HUAWEI TECHNOLOGIES CO., LTD.
OptiX RTN 980 Radio Transmission System V100
IDU Quick Installation Guide (Indoor)
Issue: 01
Date: 2018-10-30
Question and Answer IconNeed help?

Do you have a question about the Huawei OptiX RTN 980 and is the answer not in the manual?

Huawei OptiX RTN 980 Specifications

General IconGeneral
BrandHuawei
ModelOptiX RTN 980
CategoryMicrophone system
LanguageEnglish

Summary

Precautions

Power Supply Safety

Describes power supply requirements and potential risks for the equipment.

Electrostatic Discharge Protection

Details ESD precautions and grounding procedures to protect sensitive components.

Cable Binding Guidelines

Specifies cable binding intervals and placement rules inside and outside cabinets.

Pre-installation Environment Check

Lists essential checks for the telecommunications room and associated facilities before installation.

Handling Boards

Essential Handling Precautions

Emphasizes ESD protection and proper board handling techniques to prevent damage.

Filler Panel Installation

Explains the importance of filler panels for protecting vacant slots from foreign matter.

Toggle Lever Switch Handling

Safe Operation of Toggle Switch

Instructs to pull out the toggle lever switch gently before turning it.

IF Cable Handling Precautions

IDU-side IF Cable Disconnection

Emphasizes powering off the ODU before disconnecting IF cables from the IDU.

ODU-side IF Cable Disconnection

Emphasizes powering off the ODU before disconnecting IF cables from the ODU.

IF Cable Installation/Removal (Dual-Channel)

IF Cable Connection Sequence

Specifies connecting IF cables to the ODU first, then to the IDU.

IF Cable Disconnection Sequence

Specifies disconnecting IF cables from the IDU first, then from the ODU.

IF Board Handling

IF Board Installation/Removal Safety

Emphasizes powering off the ODU before removing or inserting IF boards.

Installation Tools

Essential Tools List

Provides a comprehensive visual list of tools required for installation.

RTN 980 Equipment Introduction

RTN 980 Exterior Views

Details the front, oblique, and side views of the RTN 980 equipment.

Cabinet and Mounting Ear Installation Requirements

Cabinet Type Compatibility

Mentions compatibility with ETSI, 21-inch open rack, and 19-inch standard cabinets.

Chassis Mounting Procedure

Describes steps for mounting chassis using screws and floating nuts.

Cabinet Installation Details

Mounting Ear Configurations

Describes mounting ear usage for ETSI and 19-inch cabinets.

Cabinet-Sharing Installation

Provides recommendations for shared cabinets and heat dissipation.

Installing the RTN 980 Chassis in 19-Inch Cabinet

Fixing Floating Nuts for 19-Inch Cabinet

Details on securing floating nuts for chassis installation in a 19-inch cabinet.

Removing Screws for 19-Inch Cabinet

Instructions on removing screws for chassis mounting in a 19-inch cabinet.

Installing the RTN 980 Chassis in ETSI Cabinet

Fixing Floating Nuts for ETSI Cabinet

Details on securing floating nuts for chassis installation in an ETSI cabinet.

Replacing Mounting Ears for ETSI Cabinet

Instructions for replacing mounting ears for ETSI cabinets.

Installing PGND Cables

Connecting PGND Cables to Ground Point

Details on connecting PGND cables to cabinet ground points.

Optional E1 Panel Installation

Fixing Floating Nuts for E1 Panel

Steps for securing floating nuts for the E1 panel.

Optional E1 Panel Installation (Continued)

Fixing the E1 Panel

Describes the process of fixing the E1 panel into the chassis.

Installing PGND Cables on E1 Panel

Details connecting PGND cables to the E1 panel.

Installing Boards

Board Installation Procedure

Step-by-step guide for installing boards, including safety measures.

Installing PGND Cables (Cabinet Types)

PGND Cable Connection in ETSI Cabinet

How to connect PGND cable in an ETSI cabinet.

PGND Cable Connection in 19-Inch Cabinet

How to connect PGND cable in a 19-inch cabinet.

Installing Power Cables

Power Cable Connection Steps

Guides through connecting power cables and checking fuse/voltage.

Power Supply Voltage and Fuse Check

Details on input voltage, allowable range, and fuse requirements.

Installing E1 Cables

Connecting E1 Cables to External Equipment

Describes connecting E1 cables to external equipment.

Connecting E1 Cables to the E1 Panel

Describes connecting E1 cables to the E1 panel.

Installing Ethernet Service Cables

Ethernet Port Cable Assembly

Guides on connecting Ethernet service cables to FE/GE ports.

Installing XPIC Cables

XPIC Cable Connection

Instructions for connecting XPIC cables between boards.

Installing IF Jumpers

IF Jumper Installation Procedure

Steps and precautions for installing IF jumpers.

Connecting IF Jumper to IF Cable

How to connect IF jumper to IF cable and ODU.

Installing Fibers

Fiber Installation Precautions

Safety and handling tips for fiber installation, including eye protection.

Fiber Cable Routing

Guidelines for routing fiber cables and corrugated pipes to prevent damage.

Installing STM-1e Cables

STM-1e Cable Connection

Guides on connecting STM-1e electrical ports.

Installing NM Cables (Gateway NE)

NM Cable Connection for Gateway NE

How to connect NM cables for a gateway NE.

Installing NM Cables (Interconnected NEs)

NM Cable Connection for Interconnected NEs

Instructions for connecting NM cables between multiple NEs.

Installing Orderwire Phone Cables

Orderwire Phone Cable Connection

How to connect phone cables to the AUX board's PHONE port.

Installing External Clock Cables

External Clock Cable Pin Assignment

Table detailing pin assignments for external clock cables.

Clock/Time Cable Connection

How to connect clock/time cables to the CLK/TOD1 port.

Installing Asynchronous and Synchronous Data Cables

Data Cable Pin Assignment

Table detailing pin assignments for asynchronous and synchronous data cables.

Data Cable Connection

How to connect data cables to the F1/S1 port.

Installing External Alarm Cables

Alarm Cable Pin Assignment

Table detailing pin assignments for external alarm cables.

Alarm Cable Connection

How to connect alarm cables to ALMO and ALMI ports.

Cable Layout Effectiveness

Cable Connections Overview

Diagram showing various cable connections and their labels.

Cable Layout Best Practices

Visual guide to effective cable layout and management.

Powering On the Equipment

Pre-Power On Checks

Ensures ODU installation and switch state before powering on the equipment.

Indicator Status Description

Explains the meaning of PWR, ALM, and FAN indicators on the equipment.

Configuring NE Data (Web LCT)

Web LCT Configuration Steps

Guides on using Web LCT for NE data configuration.

Aligning Antennas

Aligning Single-Polarized Antennas

Step-by-step guide for aligning single-polarized antennas.

Antenna Alignment Procedure

Details on adjusting azimuth, elevation, and RSSI for alignment.

Aligning Antennas (Continued)

Aligning Dual-Polarized Antennas

Procedure for aligning dual-polarized antennas.

Antenna Alignment Testing

Steps involving RSSI measurement and XPD calculation for alignment.

Checking the Radio Link Status

LINK Indicator Status Check

Interpreting LINK indicator states for radio link functionality.

Checking the Installation

Installation Verification Checklist

A comprehensive checklist for verifying installation completeness and correctness.

Installing Power Cables for C3 PDU

DC Power Distribution Box Connections

Details on connecting power cables to the DC power distribution box.

C3 PDU Power Specifications

Lists input/output voltage, current, and protection details for C3 PDU.

Installing Mounting Ears for C3 PDU

C3 PDU Mounting in 19-Inch Cabinet

Instructions for installing C3 PDU mounting ears in a 19-inch cabinet.

C3 PDU Mounting in ETSI Cabinet

Instructions for installing C3 PDU mounting ears in an ETSI cabinet.

Power Cable Connections

C3 PDU to Subrack Power Cabling

Diagram showing power cable connections between C3 PDU and subrack.

PGND and Power Cable Routing

Guidelines for routing PGND and power cables for safety and organization.

Assembling Cable Connectors

Assembling OT Terminals and Power Cables

Procedure for assembling OT terminals onto power cables.

OT Terminal Assembly Steps

Detailed steps for stripping, routing, and crimping OT terminals.

Assembling Cable Connectors (Cord End Terminals)

Assembling Cord End Terminals and Power Cables

Procedure for assembling cord end terminals onto power cables.

Cord End Terminal Assembly Steps

Detailed steps for stripping, routing, and crimping cord end terminals.

Assembling Cable Connectors (Width Check)

Cord End Terminal Width Check

Checking cord end terminal width against a provided table after crimping.