  • J
    Jordan HancockSep 23, 2025
    What to do if Huawei TE30 has insufficient port resources due to multiple conferences?
    • S
      Stanley LewisSep 23, 2025
      If port resources are insufficient due to multiple ongoing conferences, you need to wait until resources become available. Alternatively, reduce the number of sites attending the conference and then add sites as required after the conference has started successfully.
  • K
    Kimberly WilliamsAug 23, 2025
    Why can't I call a remote site using the IP address on my Huawei Conference System?
    • A
      Amanda HolmesAug 23, 2025
      If you're unable to place a call to a remote site using the IP address on your Huawei Conference System, it could be due to incorrect NAT settings if your local endpoint is on a private network and the remote endpoint is on a public or different private network. Verify the NAT settings under Advanced Settings > Settings > Network > Firewall. Alternatively, the GK with which your local or remote endpoint is registered might not support placing calls using the IP address. In this case, disable the GK under Advanced Settings > Settings > Network > IP > H.323 at both the local and remote sites.
  • S
    Shane GuzmanAug 25, 2025
    How to improve blurry remote video quality on Huawei TE30 Conference System?
    • D
      danielle25Aug 26, 2025
      If the remote video is unclear during a conference on your Huawei TE30 system, with artifacts, frozen images, or discontinuity, the issue could stem from several factors. It may be due to faults on the local video module, requiring the TE30 to be sent to the local distributor for maintenance. Check if the remote camera is set to focus automatically, rather than on a near or far scene. If the conference rate is below 256 kbit/s, ensure the audio protocol is set to G.728 to reduce audio bandwidth usage. High network traffic can also cause low video bandwidth; avoid conferences during peak network hours. Lastly, poor quality network connection devices may cause data loss; consider replacing these devices.
  • J
    Johnny FloydAug 26, 2025
    Why can't local and remote sites call each other using site numbers on Huawei Conference System?
    • K
      kmurrayAug 26, 2025
      If the local and remote sites cannot call each other using site numbers on your Huawei Conference System, it may be because either the local or remote site is not registered with a GK. Verify the GK registration settings. Another reason could be that the local or remote endpoint is not connected to an IP network. Ensure that the IP network cable is properly connected and verify the IP network settings.
  • M
    michael95Aug 27, 2025
    What to do if Huawei TE30 Conference System display doesn't show video or UI?
    • H
      Henry LinAug 27, 2025
      If your Huawei TE30 Conference System display doesn't show the remote controlled UI or local video when powered on but not in a conference, first check if the display is powered on. If it is, ensure the correct video channel is selected using the remote control. Incorrect video settings on the TE30 or display, such as brightness set to 0, can also cause this; retain the default values for video parameters. Finally, verify that the video cable is securely connected between the TE30 and the display.
  • K
    Kelly GilmoreSep 17, 2025
    What to do if Huawei Conference System local address book records cannot be exported?
    • M
      michaeldavisSep 17, 2025
      If you're unable to export records from the local address book on your Huawei Conference System, the pop-up blocker is likely enabled on your browser. In Internet Explorer, go to Tools > Pop-up Blocker > Turn Off Pop-up Blocker. If using Firefox, go to Tools > Options. On the General tab, select Show the Downloads window when downloading a file. On the Privacy tab, select Accept cookies from sites, and then click OK to save the settings.
  • R
    ruth48Sep 14, 2025
    What to do if a predefined conference fails to start on Huawei TE30?
    • L
      lkelleySep 14, 2025
      If a predefined conference fails to initiate on your Huawei TE30, it could be because the TE30 is disconnected from the videoconferencing network. Check the network connection and fix any identified issues.
  • N
    Nicole KingSep 15, 2025
    Why is the Huawei Conference System web interface slow in Internet Explorer 6?
    • R
      Robert HillSep 15, 2025
      If the endpoint web interface responds slowly in Internet Explorer 6, it's likely that the JavaScript engine of Internet Explorer 6 is not upgraded, or the required patches are not installed. Install the necessary patches and consider installing Microsoft Windows Script 5.7.
  • C
    Cynthia GarciaSep 6, 2025
    Why does Huawei TE30 Conference System show local video but not remote controlled UI?
    • B
      bfrazierSep 6, 2025
      If the Huawei TE30 Conference System displays local video but not the remote controlled UI during a conference, ensure a display is connected to the output port of the remote controlled UI and verify the display's video settings. If the TE30 isn't responding to remote control operations, Telnet to the TE30. If you still can't operate it, the endpoint might be malfunctioning. Restart the TE30; if the problem continues, contact your local distributor for maintenance.
  • T
    Tyler LeSep 3, 2025
    Why can I only hear the local site during a Huawei TE30 conference?
    • D
      dennis98Sep 3, 2025
      If you can only hear the sound from the local site during a Huawei TE30 conference, it's possible that a loopback test is being performed at the local site. Stop all local and remote loopback tests.

Overview

This document describes the PDC-0091V2ACIOA V100R001 Power Distribution Cabinet (PDC), a crucial component for managing power in Uninterruptible Power System (UPS) setups. The PDC, also referred to as a Power Distribution Unit (PDU), is designed to work with various Huawei UPS models, including UPS2000-G-6K/10KRTS, UPS2000-G-6K/10KRTL, and UPS2000-G-15K/20KRTL, supporting both three-phase input single-phase output and single-phase input single-phase output configurations.

Function Description

The PDC-0091V2ACIOA serves as a central point for power distribution, ensuring reliable and organized power delivery to connected equipment. It integrates multiple circuit breakers for input and output lines, bypass circuits, and maintenance bypass, enhancing system reliability and safety. The unit facilitates the connection of UPS systems to AC mains, AC loads, and provides communication ports for monitoring and control. Its design allows for flexible installation, either rack-mounted or tower-mounted, to suit different data center or equipment room layouts. The PDC manages power flow, protects against overcurrents, and provides a safe means for system maintenance through its bypass capabilities.

Important Technical Specifications

  • Model: PDC-0091V2ACIOA
  • Applicable UPS Models: UPS2000-G-6K/10KRTS, UPS2000-G-6K/10KRTL, UPS2000-G-15K/20KRTL (supporting Three-Phase Input Single-Phase Output and Single-Phase Input Single-Phase Output).
  • Weight: 13 kg
  • Dimensions (H x W x D): 130 mm x 430 mm x 585 mm
  • Input/Output Circuit Breakers:
    • UPS 1 Mains Input Circuit Breaker
    • UPS 2 Mains Input Circuit Breaker
    • UPS 1 Bypass Input Circuit Breaker
    • UPS 2 Bypass Input Circuit Breaker
    • UPS 1 Output Circuit Breaker
    • UPS 2 Output Circuit Breaker
  • Maintenance Bypass: Includes a dedicated circuit breaker and cover for safe maintenance operations.
  • Output Sockets:
    • Output socket group 1 (250 V AC, 15 A) with corresponding fuses.
    • Output socket group 2 (250 V AC, 10 A) with corresponding fuses.
  • Communication Ports: Control Area Network (CAN) communication ports for checking input and output voltage of the PDU.
  • Cable Specifications (Examples):
    • PDU AC output power cable:
      • 6 mm² (1+1 UPS2000-G-6 KVA parallel system) / 10 mm² (1+1 UPS2000-G-10 KVA parallel system)
      • 16 mm² (2+0 UPS2000-G-6 KVA parallel system) / 16 mm² (2+0 UPS2000-G-10 KVA parallel system)
      • 16 mm² (1+1 UPS2000-G-15 kVA/20 kVA parallel system)
    • PDU bypass input power cable:
      • 6 mm² (1+1 UPS2000-G-6 KVA parallel system) / 10 mm² (1+1 UPS2000-G-10 KVA parallel system)
      • 16 mm² (2+0 UPS2000-G-6 KVA parallel system) / 16 mm² (2+0 UPS2000-G-10 KVA parallel system)
      • 16 mm² (1+1 UPS2000-G-15 kVA/20 kVA parallel system)
    • PDU mains input power cable (for 1+1 UPS2000-G-15 kVA/20 kVA parallel system, three-phase input): 6 mm² (1+1 UPS2000-G-15 kVA/20 kVA parallel system)
    • Maintenance bypass port cable: RVV 4 x 0.5
    • CAN communications port cable: SBYV-100 4 x 2 x 0.5
    • Cable for short-circuiting mains and bypass input N wiring terminals: 6 mm² (M4 to M6 terminals)
  • Torque for Power Cables:
    • UPS2000-G-6 KVA: M4 x 0.7p screw, 1.3 N-m torque
    • UPS2000-G-10 kVA / UPS2000-G-15 kVA / UPS2000-G-20 kVA: M5 x 0.8p screw, 1.5 N-m torque
    • PDU: M5 x 0.8p screw, 1.5 N-m torque

Usage Features

  • Flexible Installation: The PDC supports both rack-mounting (19-inch rack) and tower-mounting configurations.
    • Rack-mounting: Involves installing mounting brackets, then using either floating nuts with common guide rails or adjustable guide rails (optional) with floating nuts. The guide rails are marked 'R' for right and 'L' for left to prevent incorrect installation.
    • Tower-mounting: Requires rotating the PDU front panel logo 90 degrees anticlockwise. Support bases are assembled and placed on the floor, with devices secured on them. The minimum distance between support bases is 280 mm. Rubber plugs are used to seal screw holes after tower-mounting.
  • Cable Management: The PDU provides clearly labeled ports for UPS mains input, bypass input, output, and communication, facilitating organized cable connections. Instructions emphasize connecting cables from bottom to top for devices, and bottom to top for cables within a single device.
  • Safety Precautions: The manual highlights critical safety measures, including using insulated tools, wearing insulation gloves, and using dry power fire extinguishers. It also provides warnings about potential hazards, equipment damage, and personal injury.
  • Personnel Requirements: Only trained and qualified personnel are authorized to install, operate, and maintain the equipment.
  • Movement Regulations: Specific guidelines are provided for moving the PDU based on its weight, with different recommendations for weights less than 18 kg, 18-32 kg, 32-55 kg, and greater than 55 kg. Users are cautioned not to move the PDU by holding its mounting brackets, front panel, or terminal cover.
  • Cable Preparation: Detailed instructions are given for making OT terminals, including using hydraulic pliers of proper specifications, removing burrs, and insulating exposed metals with heat shrink tubing to prevent short circuits.
  • Power-On Procedure: Refers to specific UPS quick installation guides for detailed power-on instructions, indicating a sequential process after all cables are properly connected.

Maintenance Features

  • Maintenance Bypass Functionality: The PDC incorporates a maintenance bypass circuit, allowing the UPS to be taken offline for maintenance without interrupting power to the connected loads.
    • Procedure: Involves opening the maintenance bypass circuit breaker cover, closing the maintenance bypass circuit breaker (circuit breaker 7), opening UPS input and output circuit breakers (circuit breakers 1-6), and disconnecting battery pack hot-swap terminals (if applicable).
    • Alarm Monitoring: The system generates a "Maint. Breaker close" alarm, and the UPS transfers to bypass mode, which can be viewed through the PDU's interface.
    • Voltage Verification: Users are instructed to use a multimeter to verify that UPS input and output voltages are 0 V before proceeding with maintenance, ensuring safety.
  • Modular Design: The presence of separate circuit breakers for UPS 1 and UPS 2 mains input, bypass input, and output, along with distinct output socket groups, suggests a modular approach that simplifies troubleshooting and component replacement.
  • Clear Labeling: The front and rear panels feature clear labeling for all ports, circuit breakers, and indicators, aiding in quick identification and maintenance tasks.
  • Adjustable Support Base (Tower-mounting): The support base length is adjustable, and components can be added to increase its length, providing flexibility for different device configurations and ensuring stability during maintenance.

Huawei PDC-0091V2ACIOA Specifications

General IconGeneral
BrandHuawei
ModelPDC-0091V2ACIOA
CategoryWireless Router
LanguageEnglish