EasyManua.ls Logo

Huawei SUN2000-115KTL-M2 - Support-Mounted Installation

Huawei SUN2000-115KTL-M2
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 4-8 Hole dimensions
4.4.1 Support-mounted Installation
Prerequisites
M12x40 bolt assemblies are supplied with the mounting bracket. If the bolt length
does not meet the installation requirements, prepare M12 bolt assemblies by
yourself and use them together with the supplied M12 nuts.
Procedure
Step 1 Determine the positions for drilling holes using the mounting bracket. Level the
positions of mounting holes using a bubble or digital level, and mark the positions
with a marker.
Step 2 Drill holes using a hammer drill. It is recommended that anti-rust measures be
taken on the positions for drilling holes.
Step 3 Secure the mounting bracket.
Figure 4-9 Installing the mounting bracket
----End
SUN2000-(100KTL, 110KTL, 115KTL)-M2
User Manual 4 Installation
Issue 07 (2023-04-30) Copyright © Huawei Technologies Co., Ltd. 35

Table of Contents

Other manuals for Huawei SUN2000-115KTL-M2

Related product manuals