EasyManuals Logo

Huawei SUN2000-200KTL-H2 Quick Guide

Huawei SUN2000-200KTL-H2
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
11
(Optional) Installing the Solar Tracker Power Cable
4.6
1. A switch-disconnector-fuse or fuse-switch-disconnector with a voltage of no less than 800 V,
current of 16 A, and protection type of gM needs to be installed between the SUN2000 and
the tracker controller for protection.
2. The cable between the wiring terminal on the power cable and the switch-disconnector-fuse
or fuse-switch-disconnector should be less than or equal to 2.5 meters.
Removing the Rubber Rings from the Crimping Module
4.5
Use scissors to cut off the joints of the rubber rings to remove them. All rubber rings are
removed in the same way.
Installing AC Output Power Cables
4.7

Other manuals for Huawei SUN2000-200KTL-H2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-200KTL-H2 and is the answer not in the manual?

Huawei SUN2000-200KTL-H2 Specifications

General IconGeneral
BrandHuawei
ModelSUN2000-200KTL-H2
CategoryInverter
LanguageEnglish

Related product manuals