EasyManua.ls Logo

Huawei SUN2000-29.9KTL - Verifying the Installation; Powering on the System

Huawei SUN2000-29.9KTL
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
5. Insert the RJ45 connector into the FE network
port in the maintenance compartment of the
SUN2000.
6. Bind the communications cables.
7. Use a torque wrench with an open end of 33 mm to tighten the locking cap to a torque of 7.5 N·m,
and seal the waterproof connector.
5
Verifying the Installation
1.
The SUN2000 is installed correctly and securely.
Yes
No N/A
2.
The DC switches and downstream AC output switch are OFF.
Yes
No N/A
3.
Ground cables are connected correctly and securely, without open circuits
or short circuits.
Yes
No N/A
4. AC output power cables are connected correctly and securely, without open
circuits or short circuits.
Yes
No N/A
5.
DC input power cables are connected correctly and securely, without open
circuits or short circuits.
Yes
No N/A
6.
The communications cables are connected correctly and securely.
Yes
No N/A
7.
All the connectors in use at the bottom of the enclosure are sealed.
Yes
No N/A
8.
The AC terminal cover is reinstalled.
Yes
No N/A
9.
The maintenance compartment door is closed and the door screws are
tightened.
Yes
No N/A
10.
The idle DC input terminals are sealed.
Yes
No N/A
11.
The idle USB port is plugged with a waterproof plug.
Yes
No N/A
12.
Idle AC OUTPUT and COM connectors are plugged and the locking caps
are tightened.
Yes
No N/A
6
Powering On the System
Before turning on the AC switch between the SUN2000 and the power grid, use a multimeter to
check that the AC voltage is within the specified range.

Other manuals for Huawei SUN2000-29.9KTL

Related product manuals