EasyManuals Logo

Huawei SUN2000-75KTL Series Quick Guide

Huawei SUN2000-75KTL Series
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
8
Installing a PE Cable
4.2
It is recommended that the
PE cable of the solar inverter
be connected to a nearby
ground point. Connect the PE
points of all solar inverters in
the same array to ensure
equipotential connections to
PE cables.
To enhance the corrosion
resistance of a ground
terminal, you are advised to
apply silica gel or paint on it
after connecting the PE cable.
Opening the Maintenance Compartment Door
4.3
Do not open the panel of the solar inverter.
Before opening the maintenance compartment door, turn off the downstream AC output
switch and three DC switches at the bottom.
Do not open the maintenance compartment door in rainy or snowy days. If you have to, take
protective measures to prevent rain or snow from entering the maintenance compartment.
Do not leave unused screws in the maintenance compartment.
1. Loosen the screws on the
maintenance compartment door.
2. Open the maintenance compartment door and
adjust the support bar.
Reserved PE point

Other manuals for Huawei SUN2000-75KTL Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-75KTL Series and is the answer not in the manual?

Huawei SUN2000-75KTL Series Specifications

General IconGeneral
BrandHuawei
ModelSUN2000-75KTL Series
CategoryInverter
LanguageEnglish

Related product manuals