EasyManua.ls Logo

Hubbell EMV - Annual Tank Flushing Procedure

Hubbell EMV
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
ANNUAL INSPECTION
1. Flush tank as follows
a. Shut off power supply.
b. Close valve on hot water outlet piping.
c. Open valve on drain piping.
d. Cold water inlet line pressure will be strong enough to flush sediment from the bottom
of the tank out through the drain. Let water run for 3-4 minutes.
e. Close drain valve.
f. Open hot water valve.
g. Turn power supply ON.
MIXING VALVE INSPECTION AND TEST LOG
COMPANY:
HEATER SERIAL NUMBER:
DATE START-UP
SPIKE
OUTPUT
TEMPERATURE
COMMENTS TESTED
BY

Related product manuals