Commissioning
OPERATION MANUAL Chapter 2
Unistat® V2.0.0en/09.06.16//15.09
PROCEDURE
Close (if fitted) the >Cooling water drain< [15].
Connect the >Cooling water outlet< [14] to the water return flow. A seal must be used.
Connect the >Cooling water inlet< [13] to the water supply. A seal must be used.
Leaking cooling water connections
DAMAGE BY ROOM FLOODING
Slowly open the building-side shut-off valves of the cooling water supply and return line.
If water leaks from the cooling water connections: shut off the cooling water supply and return
line immediately.
Provide leakproof cooling water connections.
Open the shut-off valves in the water line on the temperature control unit and on the building
side.
Check the connections for leaks.
2.10 Preparations for operation
2.10.1 Unscrewing/activating the leveling feet (if any)
The leveling feet are not unscrewed/activated before switching on the temperature control unit
DEATH OR SERIOUS INJURY DUE TO CRUSHING
The parking brakes must be activated at the casters (if any) and/or the leveling feet must be
unscrewed/activated before the temperature control unit is put into operation.
The temperature control unit may move if the parking brakes of the casters (if any) are not
activated and/or the leveling feet are not unscrewed/activated.
Always unscrew/activate the leveling feet before switching on the temperature control unit.
Uneven floors can be compensated by adjusting these leveling feet.
PROCEDURE
Verify that the parking brakes of the casters (if any) have been activated.
Unscrew the leveling feet.
Compensate uneven floors by adjusting these leveling feet, if necessary. Use a spirit level to
horizontally align the temperature control unit.
Tighten the lock screws on the leveling feet after aligning the temperature control unit. This
prevents the leveling feet from changing their height during operation.
2.10.2 Opening/closing valves
Opening valves:
Open valves by turning them counterclockwise (turn 90° left as far as it will go).
Close valves:
close valves by turning them clockwise (turn 90° right as far as it will go).
PROCEDURE
Check that all valves are closed.
Close all valves by turning them clockwise (turn 90° right as far as it will go).
Opening and closing
valves