EasyManua.ls Logo

Hunter 31 - Power System Operation Procedures; Optinal Battery Charging System Operation Procedures

Hunter 31
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
H31 POWER SYSTEMS OPERATION PROCEDURES
POWER SOURCE:
TO OPERATE:
(12V.)D.C. MAIN
1. TURN BATTERY SWITCH (LOCATED AT NAV STATION, FACING INBOARD)
TO THE #1, #2 OR "BOTH" POSITION.
** (SEE BATTERY SEL. SW. NOTE BELOW)
2. TURN ON "D.C. MAIN" BREAKER ON BATTERY SWITCH PANEL.
D.C. DISTRIBUTION PANEL SHOULD NOW BE OPERABLE.
IF NO POWER:
CHECK BATTERY CONNECTIONS.
(120V.) A.C. MAIN
1. CONNECT SHORE POWER CABLE TO DOCKSIDE POWER SUPPLY AND SHORE
(230V.A.C. ON SOME
POWER INLET ON STERN OF BOAT.
OVERSEAS MODELS)
2. TURN ON "A.C. MAIN" BREAKER ON A.C. MAIN DISTRIBUTION PANEL.
A.C. DISTRIBUTION PANEL SHOULD NOW BE OPERABLE.
IF NO POWER:
CHECK BREAKER AT DOCKSIDE POWER SUPPLY BOX.
CHECK A.C. BREAKER LOCATED IN EURO LOCKER .
H31 OPTIONAL BATTERY CHARGING SYSTEM OPERATION PROCEDURES
CHARGE SOURCE:
TO OPERATE:
OPT. BATTERY CHARGER
1. CONNECT SHORE POWER CABLE TO POWER A.C. SIDE OF MAIN DISTRIBUTION
PANEL AND TURN ON THE "A.C. MAIN" BREAKER.
2. TURN OPT. "BATTERY CHARGER" BREAKER TO THE "ON" POSITION
NOTE:
IT IS NOT NECESSARY
TO TURN ON THE BATTERY SWITCH TO PROVIDE CHARGING POWER
TO THE BATTERY/S.**
ENGINE ALTERNATOR 1. CHECK SEA STRAINER & OPEN ENGINE RAW WATER SEACOCK. SEE PAGE 60A FOR LOCATION.
2. TURN BATTERY SELECTOR SWITCH TO THE #1, POSITION.
**
3. START SHIP'S ENGINE (
FOLLOW STARTING INSTRUCTIONS IN THE "ENGINE MANUAL"
)
**BATTERY SEL. SWITCH
NOTE: THE H30 IS CAPABLE OF HAVING TWO BATTERIES IF DESIRED (2ND BATT. NOT PROVIDED) SEE PAGE
DC SECTION FOR BATTERY CONNECTION / OPTIONAL CHARGER DETAILS. WHEN CONNECTED AS SHOWN,
YOU NOW HAVE ISOLATION CAPABILITIES BY TURNING THE SEL. SW. TO THE #1 OR #2 POSITION, OR DRAW
POWER FROM BOTH BATTERIES WHEN SWITCH IS IN THE "BOTH" POSITION.
PAGE 63A-2

Table of Contents

Related product manuals