H31 POWER SYSTEMS OPERATION PROCEDURES
1. TURN BATTERY SWITCH (LOCATED AT NAV STATION, FACING INBOARD)
TO THE #1, #2 OR "BOTH" POSITION.
** (SEE BATTERY SEL. SW. NOTE BELOW)
2. TURN ON "D.C. MAIN" BREAKER ON BATTERY SWITCH PANEL.
D.C. DISTRIBUTION PANEL SHOULD NOW BE OPERABLE.
CHECK BATTERY CONNECTIONS.
1. CONNECT SHORE POWER CABLE TO DOCKSIDE POWER SUPPLY AND SHORE
(230V.A.C. ON SOME
POWER INLET ON STERN OF BOAT.
OVERSEAS MODELS)
2. TURN ON "A.C. MAIN" BREAKER ON A.C. MAIN DISTRIBUTION PANEL.
A.C. DISTRIBUTION PANEL SHOULD NOW BE OPERABLE.
CHECK BREAKER AT DOCKSIDE POWER SUPPLY BOX.
CHECK A.C. BREAKER LOCATED IN EURO LOCKER .
H31 OPTIONAL BATTERY CHARGING SYSTEM OPERATION PROCEDURES
CHARGE SOURCE:
1. CONNECT SHORE POWER CABLE TO POWER A.C. SIDE OF MAIN DISTRIBUTION
PANEL AND TURN ON THE "A.C. MAIN" BREAKER.
2. TURN OPT. "BATTERY CHARGER" BREAKER TO THE "ON" POSITION
TO TURN ON THE BATTERY SWITCH TO PROVIDE CHARGING POWER
ENGINE ALTERNATOR 1. CHECK SEA STRAINER & OPEN ENGINE RAW WATER SEACOCK. SEE PAGE 60A FOR LOCATION.
2. TURN BATTERY SELECTOR SWITCH TO THE #1, POSITION.
FOLLOW STARTING INSTRUCTIONS IN THE "ENGINE MANUAL"
NOTE: THE H30 IS CAPABLE OF HAVING TWO BATTERIES IF DESIRED (2ND BATT. NOT PROVIDED) SEE PAGE
DC SECTION FOR BATTERY CONNECTION / OPTIONAL CHARGER DETAILS. WHEN CONNECTED AS SHOWN,
YOU NOW HAVE ISOLATION CAPABILITIES BY TURNING THE SEL. SW. TO THE #1 OR #2 POSITION, OR DRAW
POWER FROM BOTH BATTERIES WHEN SWITCH IS IN THE "BOTH" POSITION.
PAGE 63A-2