8
Note: The screw was installed for shipping purposes only.
Preparing the Light Fixture
Remove the pre-installed xture screw and red
ag from the light kit assembly. Save the screw.
It will be needed for light kit installation.
IMPORTANT
Make sure the upper switch housing is securely
attached to the mounting plate. Failure to properly
secure all 3 assembly screws could result in the
switch housing xture falling.
Follow these steps to prepare the light xture for installation.
Red Flag
KEEP
x1
Fixture Screw
Carefully remove the light
xture from the light xture
hood and set the light xture.
Insert the third screw, found in the hardware
bag, into place and then tighten all three screws.
1 of 3
Fixture Mounting Screw
Installing the Light Fixture Hood
Partially install two xture mounting
screws ,found in the hardware
bag, into the motor housing as
shown. It does not matter which two
screw holes you choose.
Feed the wire plug through the center hole of
the light xture hood. Align the keyhole slots
in the hood with the two screws you just
installed. Lift the hood so that the keyhole
slots engage the two screws, and twist
counterclockwise to lock the hood into place.
2 of 3
Fixture Mounting Screw
bag
bag
Blade Arm Screw
Ceiling Bracket Downrod Hanging Fan Wiring Canopy Blades Light Bulbs/Cage Remote Cradle