Pre-Installation Manual for i-Series Machines v387 February 2015
PRE-INSTALLATION MANUAL
FOR i-SERIES MACHINES
February 2015

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Hurco i Series and is the answer not in the manual?

Hurco i Series Specifications

General IconGeneral
ControlWinMax
Max Turning Length20.5" (520 mm)
Number of Tools12
Turret TypeVDI
Tool Capacity12

Summary

Documentation Conventions

Icons

Manual may contain icons: Caution/Warning, Important, Troubleshooting, Hints and Tricks, Where can we go from here?

Site Preparation

Machine Overview

Pictures identify recognized machine components; component location may vary by model.

Preparing the Site

Review items to ensure machine readiness for installation by Hurco Service Engineer.

Foundation Supporting the Machine

Ensure foundation supports machine weight; use continuous concrete and leveling pads compatible with soil.

Machine Dimensions

Check door and route clearances; shipping and operating dimensions detailed in specifications.

Electrical Service Requirements

Customer provides power; ensure compliance with codes, 3-phase, voltage, and amperage specifications.

Calculating Service Fusing

Determine incoming AC Voltage and 3-Phase service to calculate required service fusing.

Recommended Isolation Transformer Configuration

Customer provides transformer if required; Wye configuration is recommended for machine power.

Grounding Equipment

Connect SPG terminal to AC power source ground circuit; ensure conductor size conforms to electrical codes.

Compressed Air Requirements

Continuous clean, dry air needed; use 13mm pipe, install drip leg, avoid quick-couplers.

Recommended Operating Temperature

Operate 0-35°C (32-95°F) up to 95% humidity; use AC for ambient temps >35°C.

Tool Retention Knobs

Required for machining centers; attach to tool holders for spindle clamp mechanism.

Machine Arrival

Inspecting for Damage

Inspect for shipping damage before unloading; check shock meter sensor and structural integrity.

Machine Handling and Positioning

Covers moving, lifting requirements, and removing auxiliary equipment from shipping pallet.

Lowering the Machine onto its Foundation

Position over spot, lower to 150-250mm, position pads, adjust leveling bolts for rough level and balance.

Start-up Preparation

Pre-Installation Requirements

Ensure site readiness: equipment on-site, foundation suitable, rough-leveled, utilities available, fluids ready.

Other Materials Required

Have necessary tooling, retention knobs, test material, and coolant mixture readily available.

Service Visit

Hurco engineer performs start-up tasks: checks electrical, installs console, measures, installs components.

Programming Training

Attend hands-on classes to learn programming capabilities and operation of console and machine.

Release Notes

Release Notes v387 (February 2015)

Update to add Machining Centers; manual title update.

Release Notes v385 (January 2015)

Initial release for Turning Centers only.