EasyManua.ls Logo

Hurco VMX64 User Manual

Default Icon
257 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Pre-Installation Manual for i-Series Machines v387 February 2015
PRE-INSTALLATION MANUAL
FOR i-SERIES MACHINES
February 2015

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Hurco VMX64 and is the answer not in the manual?

Hurco VMX64 Specifications

General IconGeneral
CategoryVertical Machining Center
Spindle Motor30 hp
X-Axis Travel64 in
Z-Axis Travel30.0 in
Rapid Traverse (X, Y, Z)1417 ipm

Summary

SITE PREPARATION

Site Preparation Checklist

Review floor capacity, clearances, obstructions, utilities, and access for successful machine installation.

Machine Foundation Requirements

Ensure foundation is continuous concrete, compatible thickness/consistency for machine weight and stability.

Electrical Service Installation

Customer responsibility for power, 3-phase AC, voltage, grounding, and amperage compliance for machine operation.

Machine Grounding Procedures

Proper connection of the SPG terminal to the AC power source ground circuit for safety.

MACHINE ARRIVAL

Shipping Damage Inspection

Inspect machine for shipping damage before unloading; check shock meter sensor and structural integrity.

Machine Placement on Foundation

Instructions for positioning and leveling the machine onto foundation pads using leveling bolts for stability.

START-UP PREPARATION

Pre-Installation Checklist

Ensure equipment on-site, machine positioned/leveled, utilities ready, and all necessary fluids available.

Related product manuals