Pre-Installation Manual for i-Series Machines v387 Installation Checklist — iii
INSTALLATION CHECKLIST
Prepare the site. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 - 2
Ensure the foundation and floor are capable of supporting the machine’s weight. 1 - 3
Ensure there is a clear route from the loading dock to the machine location. . 1 - 4
Ensure there is adequate space for machine door clearances. . . . . . . . . . . . 1 - 4
Ensure there is appropriate power availability and the
voltage requirements are met. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 - 5
Ensure adequate service fusing is available. . . . . . . . . . . . . . . . . . . . . . . . . 1 - 6
Ensure transformer requirements are met. . . . . . . . . . . . . . . . . . . . . . . . . 1 - 7
Ensure proper grounding of machine. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 - 7
Ensure compressed air is available. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 - 8
Ensure operating temperature requirements are met. . . . . . . . . . . . . . . . . . 1 - 8
Inspect the machine for damage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 - 2
Ensure an appropriate forklift or crane is available to lift the machine. . . . . . 2 - 3
Review the pre-installation requirements. . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 1
Schedule an appointment for a Hurco-certified Service Engineer
to prepare the machine for start-up after power is connected
by a Certified Electrician. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 2
Attend a Hurco programming training class for machine operators. . . . . . . . 3 - 3