3 - 2 Start-up Preparation Pre-Installation Manual for i-Series Machines v387
Other Materials
Please have these materials on hand when the Hurco-certified Service Engineer arrives so
that the machine can be fully tested for commissioning.
For Machining Centers:
• Tool holders
•Retention knobs
• Material for test cut
• Coolant mixture
For Turning Centers:
• Tooling
•Boring Bars
•Inserts
• Additional Chuck Jaws
• Collets for the optional collet chuck, if applicable
• Spindle Liners for doing bar work
• Straight Shank Collet Chucks for small drills
• Tension/Compression Tap Holder
• Additional boring sleeves if needed
• Material for test cut
• Coolant mixture