Pre-Installation Manual for i-Series Machines v387 Index —I
INDEX
A
air humidity 1-8
C
classes, training 3-3
control, training 3-3
coolant
flood tank 2-3, 3-1
pump motor 2-3, 3-1
removing tank 1-4
D
damage, claim 2-2
dimensions, machine 1-4
E
electrical
codes 1-5
hookup 1-4
requirements 1-4
transformer 1-7
equipment
electrical grounding 1-7
grounding 1-7, 1-8
inspection 2-2
installation 3-1
unpacking machine 2-3
F
foundation
construction requirements 1-3
lowering the machine onto 2-6
G
ground (SPG) terminal, single point 1-7
grounding equipment 1-7, 1-8
H
humidity
air 1-8
electrical cabinet 1-8
Hurco training 3-3
I
icons -v
input voltage 1-7
inspecting for damage 2-2
installation
machine 2-6, 3-1
preparing site 1-2
isolation transformer
recommended configuration 1-7
L
leveling bolts 2-6
lifting
steel lifting bars 2-4
lowering the machine onto its foundation
2-6
M
machine
coolant system 1-9
equipment, unpacking 2-3
final positioning 2-6
foundation 1-3
grounding 1-7
inspection 2-2
installation (see installation) 1-2
leveling bolts 2-6
recommended humidity and
temperature, operating 1-8
removing from shipping pallet 2-6
requirements before service visit 3-1
start-up 3-1
transformer 1-5, 1-7
unpacking equipment 2-3
meter sensor, shock 2-2
moving the machine into final position 2-3
O
operating
machine dimensions 1-4
temperature 1-8
P
point ground (SPG) terminal, single 1-7
preparing the installation site 1-2