II - Index Pre-Installation Manual for i-Series Machines v387
R
removing coolant tank 1-4
requirements
foundation 1-3
installation site 1-2
S
Schäden
an neuen Maschinen
Inspektion 2-2
sensor, shock meter 2-2
shipping
machine dimensions) 1-4
unpacking equipment 2-3
shipping pallet, removing machine 2-6
shock meter sensor 2-2
single point ground (SPG) terminal 1-7
site
foundation 1-3
preparing for machine 1-2
preparing the installation 1-2
SPG terminal, single point ground 1-7
start-up
requirements 3-1
T
temperature, operating 1-8
terminal, single point ground (SPG) 1-7
tool retention knobs 1-9
training classes 3-3
U
unloading machine from pallet 2-6
unpacking machine equipment 2-3
V
voltage input 1-7
W
weight, machine and supporting foundation
1-3
WinMax training 3-3