EasyManua.ls Logo

Hy-Gain AR-40 User Manual

Hy-Gain AR-40
6 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
308 Industrial Park Road
S
tar
k
v
ill
e,
MS
39759
USA
Ph.
(662) 323-9538 FAX: (662) 323-6551
AR-40 / AR-40X
Antenna Rotator
INSTRUCTION MANUAL
Ge
n
e
r
a
l
Pre-Installation Check and Calibration
The Hy-Gain AR-40 antenna rotator is designed
to support and rotate large TV antennas, small CB
base antennas, and small Amateur antennas. The
AR-40 is rated to rotate antennas with up to 1.5
sq. ft. of wind area when mast mounted or 3.0 sq.
ft. when mounted inside a tower.
The AR-40 rotator unit must be wired to the con-
trol unit with a 5-wire cable. Number 22 gauge 5
conductor cable will allow normal operation for
cable lengths of up to 75 feet (22.86 m). For
longer runs, use a heavier gauge wire.
The control unit must be placed inside the house
or other protected location. The maximum voltage
produced by the control unit is 18 VAC.
Before mounting the rotator unit on your mast or
tower, check the operation with the control unit
and cable. Strip all conductors at both ends of the
cable and attach to the terminals. Connect
terminal 1 to terminal 1, etc. On the control box,
simply insert the bare wire between the nut and
the terminal and tighten the screw. Do not wrap
the wire around the screw!
Plug the control unit line cord into a convenient
wall outlet. Turn the direction control knob to
"N". Momentarily press down on the start button.
The rotator will start to turn and the indicator light
will come on. When the rotator reaches "N", it
will automatically stop and the light will go off.
Fi
g
ure I
Control Unit-Top View with Cover
Question and Answer IconNeed help?

Do you have a question about the Hy-Gain AR-40 and is the answer not in the manual?

Hy-Gain AR-40 Specifications

General IconGeneral
BrandHy-Gain
ModelAR-40
CategoryAntenna
LanguageEnglish

Summary

General Information and Setup

Rotator Specifications and Requirements

Details the Hy-Gain AR-40 rotator's design, wind area ratings, wiring, and control unit voltage.

Initial Control Unit Setup and Test

Guides on control unit placement, wiring connection, and performing a basic operation test.

Pre-Installation Calibration Procedures

Calibrating End-of-Rotation Stops

Instructions for adjusting CCW and CW end-of-rotation shafts for accurate positioning.

Finalizing Pre-Installation Steps

Steps to disconnect power and cable after successful calibration and testing.

Critical Safety Warning

Electrical Hazard Precautions

Warning regarding potential electrocution from contact with power lines.

Installation on Mast

Mounting the Rotator Unit to Mast

Procedure for attaching the rotator to the lower mast support and securing it to the mast.

Cable and Antenna Management

Guides on cable strain relief, feedline rotation loop, and antenna attachment.

Tower Installation Methods

Top of Tower Mounting Details

Instructions for mounting on a tower top plate, including spacer washers and drilling.

Inside Tower Mounting Details

Procedure for mounting inside a tower using a rotor-plate, including alignment.

Grounding and Electrical Safety

Grounding Requirements for Masts and Towers

Essential grounding procedures for masts and towers to minimize electrical and lightning hazards.

Parts List and Service Information

AR-40 Component Inventory

List of part numbers and descriptions for the AR-40 Rotator system.

Factory Repair and Support

Information on obtaining factory service, warranty repairs, and contacting customer support.

Tower Drilling Template

Related product manuals