9.2 Maintenance frame work
Mineral deposits precipitate and crystallize
very differently in different types of water,
even when two types have the same conduc-
tivity and hardness levels (the various constit-
uents in the water interact differently).
Instructions on maintenance and cleaning
intervals, or on electrode service life, are
based entirely on empirical data.
In most cases, the conductivity levels given in
the "Directions for Use" section of this manual
may be considered as typical values. Individ-
ual parameter settings as part of the control
software may be necessary.
Very seldomly, water pretreatment may be
necessary (softening by dilution to approx. 4 -
8 °gH; decarbonization/partial desalination to
achieve target reductions in carbonate hard-
ness).
For any questions with regard to water treat-
ment systems pls. contact your expert dealer.
Cycle time Maintenance work
4 weeks after
commisioning
(with normal
water quality)
Visual inspection of electrical and mechanical connections
Remove mineral deposits from steam cylinder, water drain hose and
blow-down pump
Check electrodes for burn-off
Re-tighten electrode hand nuts and all screw terminals
semiannually
(with Normal Tap
water quality
(please refer to
chapter 1.4
„Intended use“)
and “normal“
operation, i.e. 8
hours per day
Visual inspection of electrical and mechanical connections
Remove mineral deposits from steam cylinder, water drain hose and
blow-down pump.
Check electrodes for burn-off and replace, if required. Re-tighten elec-
trode hand nuts and all screw terminals