3.7 Installing a condensate neutralizer 39
3.8.1 General piping best practices 43
3.10 Electrical connections 55
3.10.1 Power quality and electrical protection 55
3.10.2 120VAC line-voltage hook-up 56
3.10.4 Thermostat / sensor wiring 59
3.10.5 Thermostat heat anticipator 60
4.0 About the boiler controller 61
5.0 Before operating the boiler 63
5.1 Important pre-ignition checks 63
5.1.1 Checklist for electrical conditions, ducting and water connections 63
6.0 Service and maintenance 65
6.1 Maintenance checklists for manager of unit 65
6.2 Maintenance checklists for heating contractor 65
6.2.7 Touchscreen boiler controller 67
6.2.9 Freeze protection 69