EasyManuals Logo
Home>IBC>Heat Pump>HPX 3

IBC HPX 3 User Manual

IBC HPX 3
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #49 background imageLoading...
Page #49 background image
49
9.0 Heat Pump Operation
Before operating the appliance, there are some important checks that need to be performed. For
more information, see Before operating the hydronic heat pump on page 1.
9.1 Starting and Shutting Down the Heat Pump
Start-up Checklist Check
With the hydronic heat pump power turned off, check that all electrical connections are
tight.
Check with a gauge that the system pressure is stable and appropriate for the application:
at all times it should be between 8 psi and 50 psi.
Check that glycol concentration is between 25% and 50% as required.
A pressure relief valve must be installed on the system.
Perform a thorough visual check for any leaks or signs of corrosion.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBC HPX 3 and is the answer not in the manual?

IBC HPX 3 Specifications

General IconGeneral
BrandIBC
ModelHPX 3
CategoryHeat Pump
LanguageEnglish