EasyManua.ls Logo

IBM 8852 - BladeCenter H Rack-mountable - Installing a Bezel; Installing a Blade Server

IBM 8852 - BladeCenter H Rack-mountable
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing a bezel
To install either the top or bottom bezel, complete the following steps.
Release buttons
Release buttons
1. Align the blue tabs on the ends of the bezel with the corresponding holes in the
front of the BladeCenter unit.
2. Firmly press the bezel into the BladeCenter unit until the tabs lock it into place.
Installing a blade server
Statement 21:
CAUTION:
Hazardous energy is present when the blade is connected to the power
source. Always replace the blade cover before installing the blade.
Attention: If this is the initial installation of a blade server in the BladeCenter unit,
you must configure the blade server with the blade-server Configuration/Setup
Utility program and install the blade-server operating system. See the
documentation that comes with the blade server for instructions.
To install a blade server, complete the following steps.
Chapter 3. Installing the BladeCenter unit and options 31

Table of Contents

Other manuals for IBM 8852 - BladeCenter H Rack-mountable

Related product manuals