EasyManua.ls Logo

IBM Power System E950 9040-MR9

IBM Power System E950 9040-MR9
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
c. While holding the blue latch (A), rotate the clip (B) into the rail until it clicks into place.
Figure 15. Installing the clip onto the rail
d. Ensure that the clip (C) is flush with the rail and that the system chassis pin is seated in the clip, as
shown in the following gure.
e. Release the blue latch (D).
16
Power Systems: Installing the IBM Power System E950 (9040-MR9)

Table of Contents

Related product manuals