EasyManua.ls Logo

IBM RS/6000 7014-S00

IBM RS/6000 7014-S00
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Do the following checks:
1. If the rack is bolted down:
a. Ensure that the rack is firmly secured to the floor.
b. Ensure that the four plastic isolator pads are under the four leveling feet.
Mounting
Plates (2)
Location
Marks
Holes for
Anchor Bolts
Tapped Holes for
Rack Mounting Bolts
Mounting
Holes
Front of
Rack
Plastic Isolator
Washer (4)
Leveling Foot (4)
Plastic Isolator
Pad (4)
Rack-Mounting
Bolts
Rack-Mounting
Bolts
3-2 7014 Model S00 Rack Installation and Service Guide

Related product manuals